Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system built to comply with demanding hygiene and production standards. The scope included the design, supply, installation and commissioning of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) https://www.penmann.co.uk/penmann-completes-precision-hvac-upgrade-for-nutricias-fsi-phases-1-2-in-liverpool/